Our current plan (WRMP14) and annual performance

Last reviewed:

In this section our current Water Resources Management Plan 2015-2040, called WRMP14, is available to download. Our annual report on performance against our plan is also available to download.

WRMP14

In July 2014 the Department for Environment, Food and Rural Affairs (Defra) approved the publication of our Water Resources Management Plan covering the 25-year period from 2015 to 2040, called WRMP14. This document is available to download below:

These documents are available on request, by emailing

consultations@thameswater.co.uk with your name and address and we'll send you a CD.

On 22 August 2014 we published the SEA Post Adoption Statement with our final plan. We have since made some minor changes to the Statement and included a timeline of the main stages of the environmental assessments completed during the preparation of the plan to help the reader (Table 4.1). This revised document is published on 3 September 2014.

Environmental report (1.64Mb)

Annual performance

We are required to prepare an annual review of our Water Resources Management Plan to report on progress, performance data, and also any changes which have been made to the plan.

In July 2017 we submitted our annual review covering the period 2016 to 2017 to the Secretary of State. This was prepared in line with the Environment Agency (EA) guidance. The document is available for stakeholders to download below.