Water transfer from Thames Water to Affinity Water
A transfer of raw water from Thames Water to Affinity Water. It would rely on new sources of water from one of the strategic resources options (STT, SESRO or London reuse) contributing to a resilient water supply for Affinity Water. The transfer route and infrastructure requirements will depend on the source water.
Option 1
Option 1 map key
- Green - Potential pipeline corridor option 1
- ][ - Potential crossing point
- 1 - Connection into existing raw water tunnel
- 2 - Proposed new water treatment works
- 3 - Connection into existing Affinity Water network
- 4 - Raw water pumping station
- 5 - Queen Mother Reservoir
- 6 - Wraysbury Reservoir
Option 2
Option 2 map key
- Orange - Potential pipeline corridor option 2
- ][ - Potential crossing point
- Grey - Existing site
- Black - Proposed site
- 1 - River Lee intake
- 2 - Raw water pumping station
- 3 - Raw water transfer station
- 4 - Water treatment works and high lift pumping station
- 5 - Drinking water transfer main (pumped)
- 6 - Drinking water transfer main (gravity)