DWMP28 documents

We’ve brought together all DWMP28 documents and supporting data in one place. They follow the latest industry guidance and framework. This makes the information clear, consistent, and easy to navigate.

two members of thames water staff on site

Document library

 Document DescriptionTime to read
Summary documentsAn overview of DWMP28, including the strategic context document and the performance indicatorsBetween six and 60 minutes
Reporting and data tablesThe annual progress report shows how each catchment is progressing through the DWMP28 stagesAround 10 minutes

Summary documents

This section brings together the key documents that summarise the scope, direction and evidence base for DWMP28. Together, they explain how the plan is being developed, the risks it addresses, and the performance measures used to assess current and future performance.

Strategic context

The strategic context document provides an overview of DWMP28 and sets out the first stage of the process. It sets the scope, future trends and performance measures that guide the development of the full plan.

Performance indicator methodologies

These documents set out the methodologies used to define, assess and forecast each DWMP28 performance indicator. They explain how indicators are measured, the assumptions and data used, and how current performance and future risks are assessed across the planning period.

Reporting and data tables

The annual progress report tracks catchment level progress against each stage of the plan. This offers a clear view of how work is advancing towards the draft DWMP28.